Mein Schiff 5

The cruise ship Mein Schiff 5 of TUI Cruises was built in 2016 and is 295 meters long with a displacement of 98,785 tons. The ship can accommodate up to 2790 passengers on board in 1253 cabins. The number of personnel on board is equal to 1030 people.

Mein Schiff 5 position

Mein Schiff 5 current position is as follows: -33.90105 N / 18.43626 W during the course of a journey to

Her current 19 days cruise started on 29 Mar, 2026 and is to end on 17 Apr, 2026

Current Cruise Itinerary

Date Destination
29 Mar Cape Town
30 Mar - 19:00 Cape Town
01 Apr 11:00 - 02 Apr 19:00 Walvis Bay
10 Apr 07:00 - 18:30 Praia
13 Apr 07:00 - 17:30 Santa Cruz de Tenerife
15 Apr 11:30 - 21:30 Gibraltar
17 Apr 04:00 Palma de Mallorca

Add a Comment

You must be logged in to post a comment

@